During the 2023 rainy season the Church roof leaked and damaged the ceiling in the annexe. Thanks to donations we were able to have the roof stripped and replaced. Replacing the ceiling will be done under another project as the plan is to divide the annexe into two offices.




The ground outside of the Church gate floods as the road is higher and there is no drainage. This makes access to the gate difficult. To help with this problem we arranged for a truck load of gravel and the youths from the Church were able to spread it out raising the level of the ground.




There is the same problem inside the gate and initially we planned to lay a concrete path from the gate to the steps of the church, but it has been decided to lay gravel, raising the level and see if this solution is sufficient.
